Get another 570 of the required
2,000 break-in miles on it
before the next steps...
Plumb turbos for oil pressure
Plumb turbos for oil drainage
Install Blow-Off Valve
Fabricate turbo exhaust system
Install turbochargers
Install nitrous plate & bottle
Install 200mph speedometer
Upgrade computer |
O
Remove diesel engine
Build new engine
Drain diesel oil from fuel tank
Remove fan shroud, space needed
Fabricate engine mounts
Adapt throttle position sensor
Install oil cooler / filter system
Fabricate transmission mounts
Mount engine and transmission
Install electric radiator fan
Install ignition system
Install electric fuel pump
Install fuel pressure regulator
Install oil pressure sending unit
Install temperature sending unit
Test fire engine (audio) |